II. PLANNING AND EXPERIMENTAL RESULTS
In the second part various responsibilities were delegated to each member of integrating project, it was given to two subjects to everyone of the team, then integrants compart the knowledge to all, having a feedback of each one of them so that way all members have the same knowledge and so fulfill the objective of working together.
Was conducted conducting various circuits which worked with the following materials.
* 1 ADC0804
* 1 Power supply 12 and -12V
* 1 5v Power Supply
* 1 dual 12v power supply and output per channel 2A
* 1 opamp
* 1 ADC0804
* 1 Power supply 12 and -12V
* 1 5v Power Supply
* 1 dual 12v power supply and output per channel 2A
* 1 opamp
Similarly the realization of circuits with simulations in the PSIM program was supplemented, also were carried out various calculations necessary to have knowledge of the estimated pumps and voltage regulator power.
Karnaugh maps were used to determine the behavior of logic gates. There were some problems in calculations, but at the end, we found a solution to it.